Name of Some Important Works:-
Project Name | Name and address of Employer | Description of work | Value of contract | Contact No. | Date of Issue of work order | Stipulated Date of Completion | Actual date of completion | Remarks explaining reasons for delay, if any |
CSC ROAD | SE/SHC-II/ | W/S CSC Road | Rs. 5.22Crore | 1/HD-1 of 2003-04 of SE,SHC-II | 12.12. 03 | 18.12. 04 | 18.03.2006 | Non availability of Fund etc. |
PMGSY Package No. WB-09-33 | The Ex Engr, WBSRDA, Howrah Divn. | Constn. of Road from Bhabanipur Chalsa Road to manasree via Subalchak via Pancharun via Santosh Chak | Rs. 341.68 Lacs | EE/HOW/06 of 2005-06 Package No. WB-09/33 of PMGSY 2005-06 | 29.12.06 | 9 (Nine) Months. | 31.03.2008 | Completed |
PMGSY Package No. WB-09-30 | The Ex Engr, WBSRDA, Howrah Divn. | Constn. of Road from Khalisani Kalitala More NH-6 to Basudevpur Bazar via Katra . | 305.64 | EE/HOW/05 of 2005-06 Package No. WB-09/30 of PMGSY 2005-06 | 29.12.06 | 9 (Nine) months | 30.12.2008 | Completed. |
HZP (RD) 02 of 2007-08 | The Ex. Engr., (RD), HZP. | Improvement of Road from Bhandaradaha Panchanantala to Bhaspur Mairapara | 438.06 | 02 of 2007-08 by EE/DRDC HZP | 19.02.2007 | 9 (Nine) months | Work completed but final bill not drawn. | Completed. |
ULU- BERIA BAGNA | EX. Engr./ How. Divn. | I/S of Uluberia Bagna Road from 4.00Kmp to 12.30Kmp. | Rs. 1.72Crore | 01/U of 2002-03 accepted by the S.E.,P.W.D, Western Circle –II. | 25.04. 02 | 3.11. 02 | July, 2003 | Non availability of Fund etc. |
KMDA | Dy. Director, T&T Sector, KMDA | Constn. Of BKP Dum Dum Exp. Way. | Rs. 1.48Crore | Tr. No. 14 of 1999-00 of DD, Cir-III | 15.11. 99 | Jan., 01 | Nov, 2002 | Non-availability of fund etc. |
CSC OLD | SE/SHC-II | Const. Of CSC Road | Rs. 1.60Crore | 11/H-1 of 99-00 | 3.12. 99 | June, 2001 | 23.5.01 |
|
Airport “C” Taxi Road | Sr Mgr. Engg. (Civil)-I AAI, AMD (Civil)-I.
| “S/R to Taxi Track and Apron at NSCBI Airport, during 2005-06 (SH : Special repairs to “C” Taxi track at NSCBI Airport, Kolkata). | Rs. 77.55Lac | Agt. No. 14/SME(C)/AMD(C)-I/2005-06 | 1.3.06 | June, 2006 | 24.11.06 | Non availability of work site etc. |
Airport DTB & ITB Road | Asstt. General mgr. Engg.(Civil) AAI, AMD-II
| Repairs to Approach road from DTB & ITB. (SH : Bituminous work – Balance work)” | Rs. 42.32 Lac | Agt. No. 13/AGME(C) AMD-II(C)/06-07 | 30.5.06 | August, 2006 | 25.11.06 | Non availability of work site etc. |
KMDA | The Ex. Engr., SCD –II, T& T Sector, KMDA | Improvement and strengthening of road surface of E.M. Bye-pass from P.C. Rotary | Rs. 123.15 Lac | Tender No. 46 of 2005-06 of SE/TTC-III/KMDA | 28.02.06 | 28.05.06 | 21.03.07 | Non-availability of Decision, Materials, fund etc. |
Airport Roads & Culverts work | Asst. GM Engg. (Civil) AAI (IAD), AMD (Civil)-II | “S/R to Roads & culverts (SH : Resurfacing to car park DTB)” | Rs. 56.01 Lac | Agt. No. 43/AGME(C)/AMD (C)-II/2006-07 | 06.02.07 | April, 2007 | 2.5.07 | Non availability of work site etc |
| Place & State | Contract No. & Date | Name & Address of Employer | Value of Contract (Rs. In Lakhs) | Stipulated period of completion | Value of works remaining to be com-pleted Lakhs) | Anticipated Date of completion |
(1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) |
Construcrtion of R.C.C. Bridge over river “Sutunga” on mathabhanga – Sitalkuchi Road at Mathabhanga Town in the district of Coochbehar | Coochbehar, W.B. | W/O No. 1076 dt. 29.07.09 | The SE, PWD, NBCC No. I, Jalpaiguri. | Rs. 473.97 | 1 (One) year | Work not Started
| September, 2010 |
Improvement of Amta – Jhikira Road from 3.50 Kmp to 10.50 Kmp in the District of Howrah under Howrah Hwy Divn. | Howrah, W.B. | Tender No. 52 of 2008-09 of SE/SHC-I/ P.W. (Roads) directorate. | The SE/SHC-I, P.W. (Roads) Directorate | Rs. 331.05 | 12 (Twelve) Months | Rs. 297.95 i.e. (90%) remaining | June, 2010 |
Construction of ROB at Baruipur in replacement of existing level crossing No. 21/B/T near Baruipur Rly. Station on Sealdah – Diamond Harbour Section in the District of South 24 Pgs. | 24 Pgs. W.B. | Tender No. LN/24 of 2008-09 | The CAO (Con), Eastern Rly,
| Rs. 262.97 | 9 (Nine) months | Rs. 170.93 i.e. (65%) remaining | Janu, 2010 |
Description of Work | Place & State | Contract No. & Date | Name & Address of Employer | Value of Contract (Rs. In Lakhs) | Stipulated period of completion | Value of works remaining to be com-pleted Lakhs) | Anticipated Date of completion |
(1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) |
| |||||||
Development of Canal West Road from B.T. Road to Maniktala Main Road. | At Kolkata, In the State of W.B. | W/O No. HRBC/12C-101/ 2007/143 dt.16.1.08 | The Chief Project Manager, HRBC, Kolkata. | Rs. 63129049.33 | 8 (Eight) Months from 24.01.2008 | 506 Lac (Approx)
| June, 09 |
Spl. Repair and Maintenance work from Km 14.400 Kmp to Km 31.00 of NH-34 in the State of W.B. Contract Package No. Krish/SR-1/08-09 | At Barasat, In the State of W.B. | W/O No. NHAI/ Tech/NH-34/WB/M&R/2006/465 dt. 22.12.08 | The General Mgr. (Tech), NHAI, Delhi. | Rs. 484.46 Lac | 4 (Four) Months. | Rs. 400.00 Lac | Apri, 2009 |
Construction of proposed Road over Bridge at Miapur in replacement of the existing level crossing No. 23/B/T near Jangipur Road Road Stn. In Malda division of E/Rly | At Murs- shidabad in the state of W.B. | Tr. No. 107 of 2008-09 (Open) | The CAO (Con) Eastern Rly, Kolkata. | Rs. 347.96 Lakhs | 9 (Nine) months | Rs.281.74 Lac | June, 2009 |
Improvement by way of strengthening of MPKR Road in the district of Howrah. | At How. In the state of W.B. | Tr. No. 31 of 2008-09 dt. 10.12.2008 | The S.E., SHC-1/PW.(R) Deptt., | Rs. 49.24 Lac | 3 (Three) Months. | Rs. 10 .00 Lac | March, 2009. |
Typical Works
Construction of RCC Road Over Bridge at Birati in replacement of level crossing No. 5T/A – Class at KM …… Eastern Rly with ancillary works. | Kolkata.
In the State of W.B. | Agt. No. DCE/CON/ LN/SDAH/230 dt. 15.5.05. | Dy. Chief Engineer, (Con.-II)/ Eastern Rly, Sealdah Kolkata. | Rs. 1.54Crore (Approx) | 14 Months. | Rs. 0.40Crore | February, 2008 |
Construction of RCC Piles, Pile caps, …….. L-xing gate No. 1/1A at LLH. | Howrah
In the state of W.B. | Tr. No. 56 of 2000-2001 (Open) | The CAO, Eastern Railway, Kolkata. | Rs. 2.50Crore | 18 Months | Rs. 0.05 Crore | October, 2006
|
Construction of Machlandapur –Baduria-basirhat road | West Bengal |
| SE PWD Eastern Circle Feb-2010 | Rs-9.34 Crore | 12 months | 0 | July 2010 |
Construction of station building ,high level platform, RUB, New Line, P-way, linking, Control Cabin in connection with new line of Azimgang and Murshidabad | Mursidabad, West Bengal | Tr No 34 of 2009-2010 (Open) CAO(Con) | CAO Eastern Railway | Rs-12.64 Crore | 12 months | 5 Crore | W-I-P |
There are several Tenders where Company Stood lowest and Several Operations which are not Mentioned.
Copyright 2010 Pam Developments Pvt Ltd. All rights reserved.
Pam Developments Pvt Ltd
Reg Off:- 514&515 G.T.Road (South). Howrah- 711101
Stack Yard: Dhulagarh
Howrah/Kolkata, WEST BENGAL
ph: 033-26384014/5769
fax: 033-26385769/4014
pdpl